Project Description

Campo Verde Solar

Fuscoe Engineering provided preliminary engineering services for a 2000-acre, 140 MW solar power plant in the County of Imperial, approximately 7 miles southwest of El Centro.

Services provided by the Fuscoe team included:

  • Preliminary Site Plan
  • Preliminary Grading Plan
  • Preliminary Hydrology Study and Storm Water Analysis
  • EIR Support
  • Final Grading Plans
  • Final Hydrology Study
  • Substation Grading Plans
  • Fencing Plans
  • Construction Trailer Move-on Plans
  • Topographic Survey
  • Mapping Services

More Photos

Campo Verde Solar

Campo Verde Solar
Campo Verde Solar

Project Details

Location:
Imperial Valley, CA

Client:
First Solar Inc.

Status:
Completed